Building Materials & Real Estate

Helix Construct entered administration owing £4.8m to suppliers

Administrator KR8 Advisory reported £4.8m owed to suppliers, £2.3m to banks and financiers and £260,000 in outstanding staff pay after the Newbury-based contractor entered administration.

Sienna VossNovember 19, 20265 min read2 views
A conceptual editorial scene of a partly built low-rise construction site and a site office desk with unbranded paperwork and a calculator, evoking financial strain in a contracting business.

Helix Construct, a Newbury-based design-and-build contractor, entered administration in September, owing £4.8m to suppliers, according to an update filed at Companies House by administrator KR8 Advisory Limited.

The administrator’s update also showed the company owed £2.3m to its banks and financiers and £260,000 in outstanding pay to its 35 staff. Those figures provide the most detailed public breakdown in the update of the liabilities facing the business at the point of administration.

Cash and contract-accounting pressure

Helix’s latest accounts indicated the business had been under growing pressure on cash and profitability, the update said. Auditors also raised concerns about the valuation and recognition of profit on several contracts.

The company reported turnover of £40m for the 18 months to June 2025, compared with £21m in the previous 12-month financial year. Because the later period covers 18 months and the earlier period covers 12, the two turnover figures are not like-for-like comparisons. The turnover growth therefore occurred over a longer reporting period.

The update and accounts point to a combination of financial strain rather than a single stated cause. The update does not set out a full timeline of events before the administration, nor does it identify which contracts were affected by the auditors’ concerns.

Creditor claims and open questions

The £4.8m owed to suppliers is the largest category of debt detailed in the update. The £2.3m owed to banks and financiers and the £260,000 in outstanding staff pay are separate from that supplier figure.

The update does not state how much creditors are expected to recover, whether assets have been sold, or whether any parts of the business have been acquired. It also does not provide a schedule for distributions or say whether the supplier debt is disputed.

Helix had been in business since 2017. It specialised in design-and-build construction for affordable housing, education, care and commercial projects across London and the south of England.

For suppliers, the reported liabilities indicate the scale of exposure described in the administrator’s filing. The figures also show that bank and financier claims and outstanding staff pay sit alongside the supplier debt, rather than being included within it.

The update sets out the debt figures and the description of financial pressure. It does not provide a recovery estimate or a conclusion on the causes of the company’s failure beyond the matters summarised by the administrator and the latest accounts.